Elkon’s Contribution to Task 4.2: Power and Control Interface Integration for Vessels

In Task 4.2, ELKON contributes by identifying the electrical and communication interfaces of the demonstration vessels, with a specific focus on the connection between the large battery system and the ship grid. ELKON ensures that the integration requirements for safe and reliable operation are addressed, bridging potential gaps between the vessel’s existing electrical architecture and the new battery installation. Currently, the overall control architecture of the systems has been defined, and ELKON continues its work on the communication aspects, ensuring compatibility and robustness across BMS, PMS, EMS, and power conversion units.